Compare & investigate

Portfolio summary

Explore the full operational GB wind catalogue, compare available results and shortlist sites.

Results use the last successfully applied scenario saved in this browser, or site defaults. Draft edits are excluded. Yield is a model-based estimate of average annual energy over the ten-year forecast on the selected source basis; R² describes the in-sample monthly fit. Candidate-only inventory sites have no published assessment.

About these model-based estimates.

Capacity factor and equivalent full-load hours use the ten-year mean model-based annual energy and the assessed configuration's capacity: full-load hours = MWh/year ÷ MW; capacity factor = full-load hours ÷ 8,760. They retain the selected source's gross/net basis, so not all sources are directly comparable. View results on the portfolio map.

ShortlistPlantCapacity
MW
Generation availableGeneration usedModel-based average yield estimate
MWh/year · 10-year mean
Model-based total yield estimate
MWh · 10 years
Model-based capacity factor
% · 8,760-hour year
Model-based equivalent full-load hours
h/year
ResourceMonthly R²BM curtailment
%
Determined availability loss
%
Import loss
%
Degradation
%/year
Correction
%
Included monthsExcluded monthsScenario & assessmentDetails

Catalogue entries are not all assessed or distinct farms; REPD phases can overlap. Generation source filters include unverified matches; resource availability does not gate catalogue inclusion. NESO BOA is supporting curtailment evidence, not a generation record. Earlier configurations and trial windows remain excluded by eligibility rules. Determined availability loss is inferred, not confirmed downtime. Missing results remain unavailable, not zero.